Documentation Update

- Added a load of missing ChangeLog entries, by running the timesheet
  report and comparing.
This commit is contained in:
Paul Beckingham
2009-08-16 23:10:21 -04:00
parent 07da2396fc
commit f04205be4c

View File

@@ -6,29 +6,33 @@
and int collision (thanks to Pietro Cerutti). and int collision (thanks to Pietro Cerutti).
+ Fixed bug #241 that prevented bash's tab-completion of projects in Fedora + Fixed bug #241 that prevented bash's tab-completion of projects in Fedora
11 and likely anything using bash-4 (thanks to John Florian). 11 and likely anything using bash-4 (thanks to John Florian).
+ Fixed bug that displays the wrong .taskrc file name on override (thanks to
Federico Hernandez).
+ Fixed bug #242 that sometimes causes the ID echoed after a task is added + Fixed bug #242 that sometimes causes the ID echoed after a task is added
to be incorrect (thanks to John Florian). to be incorrect (thanks to John Florian).
+ Fixed bug that allowed a recurring task to be added without a due date. + Fixed bug #245 that quoted date fields on export, that were subsequently
+ Fixed bug #243 that caused exported due dates to be quoted, which then improperly parsed on import (thanks to John Florian).
confused a subsequent import (thanks to John Florian).
+ Fixed bug #241 that caused redirected output to retain color control codes
for colored header and footnotes (thanks to John Florian).
+ Fixed bug #248 where single and double quotes are both stored as + Fixed bug #248 where single and double quotes are both stored as
ampersand-quot-semi (thanks to John Florian). ampersand-quot-semi (thanks to John Florian).
+ Fixed bug #249 that caused annotations with the same date to be lost after
a "task edit" command (thanks to Federico Hernandez).
+ Fixed bug #250 whereby rc.dateformat was not observed when parsing the
creation date of an annotation (thanks to Federico Hernandez).
+ Fixed bug #251 whereby the presence of annotations cause the .hasnt attribute
modifier to not work (thanks to John Florian).
+ Fixed bug #252 that prevented use of attribute modifiers on dates to effect + Fixed bug #252 that prevented use of attribute modifiers on dates to effect
a range, such as "task ls due.after:eom due.before:eoy" (thanks to John a range, such as "task ls due.after:eom due.before:eoy" (thanks to John
Florian). Florian).
+ Fixed bug #257 where an extant ~/.taskrc file prevented the override and + Fixed bug #256 that allowed a recurring task with no due date.
automatic creation of an alternate rc file (thanks to Zach Frazier). + Fixed bug #257 where an extant ~/.taskrc file prevented the override and
+ Fixed bug #250 whereby rc.dateformat was not observed when parsing the automatic creation of an alternate rc file (thanks to Zach Frazier).
creation date of an annotation (thanks to Federico Hernandez). + Fixed bug #259 that cause a build failure on Snow Leopard 10a432.
+ Fixed bug #260 whereby the start, stop and delete commands did not complain + Fixed bug #260 whereby the start, stop and delete commands did not complain
when filter arguments were specified, even though they were ignored when filter arguments were specified, even though they were ignored
(thanks to Charles T. Yun). (thanks to T. Charles Yun).
+ Fixed bug #251 whereby the presence of annotations cause the .hasnt attribute + Fixed bug that allowed a recurring task to be added without a due date.
modifier to not work (thanks to John Florian). + Fixed bug that displays the wrong .taskrc file name on override (thanks to
Federico Hernandez).
+ Fixed bug that failed to suppress color control code in the header and footnote
when redirecting output to a file (thanks to John Florian).
------ old releases ------------------------------ ------ old releases ------------------------------