Fixed documentation for 1.7.1
This commit is contained in:
@@ -5,6 +5,7 @@ taskrc \- Configuration file for the task(1) command
|
||||
|
||||
.SH SYNOPSIS
|
||||
.B $HOME/.taskrc
|
||||
.br
|
||||
.B task rc:<directory-path>/.taskrc
|
||||
|
||||
.SH DESCRIPTION
|
||||
@@ -17,7 +18,7 @@ obtains its configuration data from a file called
|
||||
$HOME/.taskrc
|
||||
.RE
|
||||
|
||||
The default location can be overriden using the
|
||||
The default location can be overridden using the
|
||||
.I rc:
|
||||
attribute when running task:
|
||||
|
||||
@@ -49,9 +50,9 @@ is the value the variable is to be set to.
|
||||
.RE
|
||||
|
||||
and set a configuration variable to a certain value. The equal sign ("=") is used to separate the variable
|
||||
name from the value to be set.
|
||||
name from the value to be set.
|
||||
|
||||
The hash mark, or pounf sign ("#") is used as a "comment" character. It can be used to annotte the
|
||||
The hash mark, or pound sign ("#") is used as a "comment" character. It can be used to annotate the
|
||||
configuration file. It is placed at the beginning of a line and all text after the character to the
|
||||
end of the line is ignored.
|
||||
|
||||
@@ -61,7 +62,7 @@ Valid variable names and their default values are:
|
||||
.TP
|
||||
.B data.location=$HOME/.task
|
||||
This is a path to the directory containing all the task files. By default, it is set up to be ~/.task,
|
||||
for example: /Users/paul/.task
|
||||
for example: /Users/paul/.task
|
||||
|
||||
.TP
|
||||
.B confirmation=yes
|
||||
@@ -75,7 +76,7 @@ May be "yes" or "no", and causes task to display the ID and description of any t
|
||||
.B next=2
|
||||
Is a number, defaulting to 2, which is the number of tasks for each project that are shown in the
|
||||
.B task next
|
||||
command.
|
||||
command.
|
||||
|
||||
.TP
|
||||
.B dateformat=m/d/Y
|
||||
@@ -112,21 +113,21 @@ m-d-y would output 07-24-09
|
||||
.B monthsperline=99
|
||||
Determines how many months the "task calendar" command renders across the screen.
|
||||
Defaults to however many will fit. If more months that will fit are specified,
|
||||
task will only show as many that will fit.
|
||||
task will only show as many that will fit.
|
||||
|
||||
.TP
|
||||
.B defaultwidth=80
|
||||
The width of tables used when ncurses support is not available. Defaults to 80.
|
||||
The width of tables used when ncurses support is not available. Defaults to 80.
|
||||
|
||||
.TP
|
||||
.B curses=on
|
||||
Determines whether task uses ncurses to establish the size of the window you are
|
||||
using, for text wrapping.
|
||||
using, for text wrapping.
|
||||
|
||||
.TP
|
||||
.B due=7
|
||||
This is the number of days into the future that define when a task is considered due,
|
||||
and is colored accordingly. Defaults to 7.
|
||||
and is colored accordingly. Defaults to 7.
|
||||
|
||||
.TP
|
||||
.B nag=You have higher priority tasks.
|
||||
@@ -153,7 +154,7 @@ to using "vi".
|
||||
.TP
|
||||
.B color=on
|
||||
May be "on" or "off". Determines whether task uses color. When "off", task will
|
||||
use dashes (-----) to underline column headings.
|
||||
use dashes (-----) to underline column headings.
|
||||
|
||||
Task has a number of coloration rules. They correspond to a particular attribute
|
||||
of a task, such as it being due, or being active, and specifies the automatic
|
||||
@@ -206,7 +207,7 @@ Certain attributes like tags, projects and keywords can also have their own colo
|
||||
.RE
|
||||
|
||||
.RS
|
||||
.TP
|
||||
.TP
|
||||
.B color.tag.X=yellow
|
||||
Colors any task that has the tag X.
|
||||
|
||||
@@ -216,49 +217,49 @@ Colors any task assigned to project X.
|
||||
|
||||
.TP
|
||||
.B color.keyword.X=on_blue
|
||||
Colors any task where the description contains X.
|
||||
Colors any task where the description contains X.
|
||||
.RE
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
shadow.file=$HOME/.task/shadow.txt
|
||||
If specified, designates a file path that will be autoamtically written to by task,
|
||||
If specified, designates a file path that will be automatically written to by task,
|
||||
whenever the task database changes. In other words, it is automatically kept up to date.
|
||||
The shadow.command configuration variable is used to determine which report is written
|
||||
to the shadow file. There is no color used in the shadow file. This feature can be useful
|
||||
in maintaining a current file for use by programs like GeekTool, Conky or Samurize.
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
shadow.command=list
|
||||
This is the command that is run to maintain the shadow file, determined by the
|
||||
This is the command that is run to maintain the shadow file, determined by the
|
||||
.I shadow.file
|
||||
configuration variable. The format is identical to that of
|
||||
.I default.command
|
||||
\&. Please see the corresponding documentation for that command.
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
shadow.notify=on
|
||||
When this value is set to "on", task will display a message whenever the shadow
|
||||
file is updated by some task command.
|
||||
file is updated by some task command.
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
default.project=foo
|
||||
Provides a default project name for the
|
||||
.I task add
|
||||
command.
|
||||
command.
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
default.priority=M
|
||||
Provides a default priority for the
|
||||
.I task add
|
||||
command.
|
||||
command.
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
default.command=list
|
||||
Provides a default command that is run every time task is invoked with no arguments.
|
||||
For example, if set to:
|
||||
@@ -293,84 +294,95 @@ The output columns, their labels and the sort order can be set using the corresp
|
||||
variables for each report.
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
report.long.description
|
||||
Lists all task, all data, matching the specified criteria
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
report.long.labels=ID,Project,Pri,Added,Started,Due,Recur,Age,Tags,Description
|
||||
.RE
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.long.columns=id,project,priority,entry,start,due,recur,age,tags,description
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.long.sort=due+,priority-,project+
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
report.list.description
|
||||
Lists all tasks matching the specified criteria
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
report.list.labels=ID,Project,Pri,Due,Active,Age,Description
|
||||
.RE
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.list.columns=id,project,priority,due,active,age,description
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.list.sort=due+,priority-,project+
|
||||
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
report.ls.description
|
||||
Minimal listing of all tasks matching the specified criteria
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
report.ls.labels=ID,Project,Pri,Description
|
||||
.RE
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.ls.columns=id,project,priority,description
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.ls.sort=priority-,project+
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
report.newest.description
|
||||
Shows the newest tasks
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
report.newest.labels=ID,Project,Pri,Due,Active,Age,Description
|
||||
.RE
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.newest.columns=id,project,priority,due,active,age,description
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.newest.sort=id-
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.newest.limit=10
|
||||
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
report.oldest.description
|
||||
Shows the oldest tasks
|
||||
|
||||
.TP
|
||||
.B
|
||||
.B
|
||||
report.oldest.labels=ID,Project,Pri,Due,Active,Age,Description
|
||||
.RE
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.oldest.columns=id,project,priority,due,active,age,description
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.oldest.sort=id+
|
||||
.B
|
||||
.br
|
||||
.B
|
||||
report.oldest.limit=10
|
||||
|
||||
|
||||
.SH "CREDITS & COPYRIGHTS"
|
||||
task was written by P. Beckingham <task@beckingham.net>.
|
||||
task was written by P. Beckingham <paul@beckingham.net>.
|
||||
.br
|
||||
Copyright (C) 2006 \- 2009 P. Beckingham
|
||||
|
||||
@@ -381,31 +393,23 @@ task is distributed under the GNU General Public License. See
|
||||
http://www.gnu.org/licenses/gpl-2.0.txt for more information.
|
||||
|
||||
.SH SEE ALSO
|
||||
.BR task (1)
|
||||
.BR task(1)
|
||||
|
||||
For more information regarding task, the following may be referenced:
|
||||
|
||||
.TP
|
||||
<http://www.beckingham.net/task.html>
|
||||
The official site.
|
||||
|
||||
.TP
|
||||
<http://groups.google.com/group/taskprogram>
|
||||
The official mailing list.
|
||||
The official site at
|
||||
<http://taskwarrior.org>
|
||||
|
||||
.TP
|
||||
The official code repository at
|
||||
<http://github.com/pbeckingham/task/>
|
||||
The official code repository.
|
||||
|
||||
.TP
|
||||
You can contact the project by writing an email to
|
||||
<support@taskwarrior.org>
|
||||
|
||||
.SH REPORTING BUGS
|
||||
.TP
|
||||
Bugs in task may be reported to the issue-tracker at
|
||||
|
||||
.RS
|
||||
<http://github.com/pbeckingham/task/issues>
|
||||
.RE
|
||||
|
||||
or to the mailing list at
|
||||
|
||||
.RS
|
||||
<http://groups.google.com/group/taskprogram>
|
||||
.RE
|
||||
<http://taskwarrior.org>
|
||||
|
||||
Reference in New Issue
Block a user